No. 17
·
Doors
Pocket door installation
Town
Elm Crossing
Time on site
2 days on site
Year
2024
Client
Builder

The job
Opened the wall, installed a heavy-duty pocket frame, and rebuilt the drywall and casing so it looks original.
Materials
Heavy-duty pocket door frame
Solid-core door
Flush pulls
Details





